November 20, 2007 - Stick Mechanism |
||||||
As far as I know, the instructions never really say when to rivet the center covers on. I figured now is as good as time as any. I clecoed them on. | ||||||
Then pop-riveted them with
LP4-3s.
|
||||||
Next I bolted the elevator forward push-rod to the stick mechanism. This type of work is always a bear, especially getting the washers in. What makes it difficult is having to lean over the side of the fuselage while trying to get your fingers down in there. | ||||||
I greased the bushings with white
lithium grease, then bolted the sticks to the stick
mechanism.
|
||||||
Both sticks done; however, I still have to do the lower cross-support. | ||||||
I bought the washer insertion tool a long time ago especially for this type of work. It's hard enough even with specialty tools like this. |
||||||