February 1, 2006 - Misc Prep Work |
||||||
While I wait for my riveting buddy to return from skiing, I tried to get a
head-start on things that happen after rolling over the 'canoe'.
I clecoed the F-721B side rails to the main longerons to make sure they still fit; thankfully they did. Then I edge-smoothed them. I rooted through my diminishing pile of fuselage parts and located the F-757 gussets. I also found the F-695 gussets and marked them for drilling per the drawings. I collected the F-636 shoulder harness anchors and F-656-L&R gusset plates and edge-smoothed all of them.
|
||||||
I retrieved the F-635 Bellcrank components, fashioned the little spacer,
and drilled and clecoed it all together. I just need to prime it,
then I can rivet it together. This component was fun. It's a
serious airplane part, as it's the bellcrank for the elevator control
rod.
|
||||||
I de-vinyled the aft top skin and F-714 aft deck, then edge-smoothed
them. With all this stuff done already, I'm hoping to make rapid
progress after flipping the canoe.
|
||||||
|
||||||