August 23, 2006 - Cabin Frame |
||||||
Preparing to match-drill the forward channels to #30. I had previously drilled #40 holes in the forward channels. | ||||||
There, the channels and strips are match-drilled. I also drilled
the forward center strap.
|
||||||