November 22, 2006 - Canopy Frame - Wing Tanks

I taped the left aft channel to the roll bar, then fitted the left side weldment on top of the 1/8" spacers for the first time. 
I taped down the right aft channel and right side weldment on top of the 1/8" spacers.
I wasn't real sure what to do next on the canopy frame so I turned my attention back to the wing.  I torqued down the bolts holding on the fuel tanks.  Then I put in all the screws.  Easy and mindless, but it has to be done, and gets me closer to the finish line. 
Previous
Home
Next