May 18, 2008 - Riveting Baffles |
||||||
After some priming, I started riveting the floor baffle assembly together. It was fun to do some riveting; it has been a long time. I used both the Main Squeeze and the rivet gun. This is the right side. | ||||||
Left
side.
|
||||||
I also made the two little rectangular clips. | ||||||
I held off on riveting the side and
front baffles for
now.
|
||||||
Good shot of the front baffle assemblies. | ||||||
And now mounted on the engine.
|
||||||
Right
front.
|
||||||
Left front. | ||||||
Next step is trim the top edges so they are aligned horizontally. | ||||||
So I removed all the baffle assemblies. | ||||||
Sans baffles.... | ||||||