April 13, 2006 - Baggage Bulkheads

I installed four nutplates on the lower baggage bulkhead,  where the notches are.  I'm going to prime the front of the baggage bulkheads, so I scuffed them up with scotchbrite. 
Another view of the baggage bulkheads, screwed together. 
Nylon "wear blocks", for the shoulder harness anchor cables, get pop-riveted in the notch area.  First I drilled holes in the wear blocks according to the drawings.  Each pop-rivet gets an aluminum backing square.  You fashion them out of a strip of  aluminum that is provided.  I drilled all the holes before cutting. 
I had screwed the lower and upper baggage bulkheads together so I could match-drill them using the wear blocks as a template.  It worked out pretty well.  After that, it was a simple matter to pop-rivet the wear blocks to the bulkheads and that was that.  Baggage bulkheads complete!
Since my nutplate installation "proficiency" is high, I went ahead and installed nutplates on the bottom of the forward baggage area side panels.  The baggage area floor screws into these nutplates. 
 
Previous
Home
Next