April 10, 2006 - Upper Baggage Bulkhead

Time to start working on the upper baggage bulkhead.  First I trimmed the bulkhead according to the drawings.  One edge has a bend in it and the drawings don't indicate whether it goes on top or bottom.  I decided top.  Hope I'm right.
After trimming, I smoothed the edges. 
No pre-drilled holes on this piece.  I measured the location of all the holes, started them with a #40, then enlarged them to #30. 
 
Previous
Home
Next