May 14, 2007 - Fuel Vent lines

I resumed work on the fuel vent lines.  I started with the top horizontal bends, then worked my way down each side.  I put the three Adel Clamps on which was easy since the screw nutplates had been done long ago.  I drilled a hole in the top forward gusset for the fourth Adel clamp.  I saved the bottom bends for last.  I stopped at this point because I hadn't made the vent bulkhead fitting that goes on the fuse floor yet. 
Previous
Home
Next